In 2013, the American Society of Civil Engineers (ASCE) Report Card for America’s Infra-structure stated that the US needs up to $1.3 trillion in capital investments to replace the aging water pipes and repair the wastewater infrastructures. It is further believed by the industry that the streamlined approach of alternative project delivery methods, such as Design-Build (DB), and Construction Manager At-Risk (CMAR) helps ensure the economical and timely design and construction of the water and wastewater infrastructures.

Keywords

Construction projects; Municipal engineering; Public works; Sewer-pipe – Maintenance and repair; Sewerage; Water-pipes – Maintenance and repair

Disciplines

Infrastructure | Water Resource Management

Language

English

Comments

This study is funded by Water Design Build Council (WDBC)


Share

COinS
 
Apr 26th, 9:30 AM Apr 26th, 3:00 PM

Owners’ Satisfaction Level with the Use of Alternative Project Delivery Methods in Water and Wastewater Infrastructures

UNLV SEB Lobby & Auditorium

In 2013, the American Society of Civil Engineers (ASCE) Report Card for America’s Infra-structure stated that the US needs up to $1.3 trillion in capital investments to replace the aging water pipes and repair the wastewater infrastructures. It is further believed by the industry that the streamlined approach of alternative project delivery methods, such as Design-Build (DB), and Construction Manager At-Risk (CMAR) helps ensure the economical and timely design and construction of the water and wastewater infrastructures.